SPINDO Supports PT PAL Indonesia's Strategic Project: Block A-B Submarine Dock
As a leader in the steel pipe industry,
PT Steel Pipe Industry of Indonesia Tbk (SPINDO) continues to support strategic infrastructure development in Indonesia. One of the latest achievements is the successful early delivery for the
PT PAL INDONESIA (PERSERO) project entitled
“Procurement of Design & Build Services for Block A-B Submarine Dock Construction & Facilities”.
The project utilizes steel pipe pile foundations specially designed by SPINDO with specifications:
These pipes not only have high durability, but are also equipped with the latest joint technology, such as
CC and
CT Joint. This technology ensures structural stability and efficiency in installation to support the dock as a solid
retaining wall construction.
CC Joint dan
CT Joint are important components in connecting steel pipe piles with precision. Here are their functions:
With this technology, the pier structure is able to withstand ground shifts while ensuring long-term durability.
The use of retaining walls in the Block A-B Submarine Pier brings a number of important benefits, including:
Pipe piles play a role in resisting soil pressure, maintaining the stability of the pier.
Marine Epoxy Coating protects the pipes from corrosion, extending the life of the infrastructure.
CC and CT Joint technology speeds up installation, saving construction time.
The Block A-B Submarine Pier Project is a major step in strengthening Indonesia's maritime and defense sectors. With SPINDO's participation, the project is expected to make a significant contribution to the development of national infrastructure.